walls.one

Prefabrication

Stop Building Walls.
Start Setting Them.

The same studs, tracks and screws — put together in our shop instead of on your deck. Drag the line to see what that changes on the day.

  • We ship nationwide
  • Installation available
1234
walls.one1234
Framed on sitePrefab by Walls.one
Drag the line

Framed on site

  1. Every stud cut on the deck
  2. Walls framed from ladders and lifts
  3. Bundles to sort, carry and stock
  4. Offcuts to carry down and haul off

Prefab by Walls.one

  1. Panels arrive framed and tagged by mark
  2. Flown straight to the floor they set on
  3. Two people guide it onto the line
  4. Floors below already closed in, deck above clear

We Ship Nationwide.

Boxed beams and wall panels go to jobsites anywhere in the country — tagged by mark and loaded in the order they set.

We Can Install It Too.

No crew to set them? Ours can. Ask for installation when you send your panels for a quote. Request a quote →

Side by side

Same Wall.
Different Job.

Nothing about the finished wall changes. Everything about getting there does.

Framing can startFramed on siteWhen the deck is poured and curedPrefabWhile the structure is still going up
Where the hours goFramed on siteOn the deck, on ladders and liftsPrefabOn a table, waist-high, under a roof
A rain dayFramed on siteStops the framingPrefabNever reaches the shop
AccuracyFramed on siteLaid out and plumbed wall by wallPrefabJigged, squared and checked on the table
Crew on siteFramed on siteA framing crew, for the durationPrefabA setting crew — yours or ours
What is left overFramed on siteOffcuts to carry down and pay to haulPrefabThe drop stays in our bin
Knowing the costFramed on siteAn estimate until the last wall is upPrefabA price on the screen before you order

How it runs

Follow One Panel
From Our Table to Your Wall.

This is WP-14 — sixteen feet of 6 in. 16 ga stud with a window in it. Five steps between your plans and your wall, and what each one saves you.

Step 1: Drawn

It Starts as a Line
on Your Plans.

Send the plans or configure it online. WP-14 gets its own elevation — every stud, the header, the opening — and nothing is cut until you approve it.

What it saves youClashes get found on paper, not on the deck.

5'-4"4'-0"6'-8"16'-0"10'-0"R.O.4'-0" × 4'-0"BOXED HEADER16" O.C. TYP.APPROVEDFOR FABRICATIONMARKWP-14SETS ONLVL 2 · C–DSTUD 600S162-54TRACK 600T125-54SCALE 1/2"=1'-0"REV AWALL PANEL ELEVATIONViewed from the exterior

Step 2: Cut

Every Stick
Cut to the Sixteenth.

The cut list is nested against stock lengths before a saw starts. Studs, cripples and sills come off the line bundled for the table they are headed to.

What it saves youThe drop stays in our bin, not your dumpster.

CUT LIST · WP-14 · 600S162-54 · 20 FT STOCK19'-10 1/2"9'-10 1/2"drop 3"29'-10 1/2"9'-10 1/2"drop 3"39'-10 1/2"6'-0"3'-10½"drop 3"46'-0"6'-0"3'-10½"3'-10½"drop 3"59'-10 1/2"3'-0"3'-0"3'-0"drop 13.5"Goes in the panelDrop — stays at the shop

An example nest for WP-14's studs, cripples and sills from 20 ft stock.

Step 3: Framed

Framed Flat,
Under a Roof.

On a jigged table, against a stop, waist-high. Screws at the spacing on the drawing, squared corner to corner, sheathed or insulated if you asked for it.

What it saves youFramer-hours on a lift — and every rain day.

The Walls.one prefab shop: crews framing steel stud wall panels and boxed beams on the tables
TABLE 4 · WP-14

Step 4: Tagged & loaded

Tagged by Mark.
Loaded in Set Order.

WP-14 gets its tag and goes on the truck in reverse — the last panel to set goes on first — so nobody on site sorts through a pile to find the next wall. That holds whether the job is across town or across the country: we ship nationwide.

What it saves youA laydown yard, and the hour spent hunting in it.

WP-11SETS 1STWP-122NDWP-133RDWP-144THWP-155THTOP OF THE LOAD SETS FIRST

Step 5: Flown & set

Flown to the Floor.
Screwed Off. Done.

The boom truck lifts it to Level 2, two people guide it onto the layout line, and it is a wall. Then the next one comes off the truck. Set them with your own crew, or have ours do it — installation is available.

What it saves youYour crew sets walls instead of building them.

A Walls.one boom truck flying a shop-built, X-braced steel wall panel up to the second floor of a concrete structure
IN THE AIR · WP-14
A sheathed Walls.one wall panel being guided into place on the second floor by a worker in a hard hat
LEVEL 2 · C–D · SET

The payoff

Faster Schedule. Smaller Crew.
Square Walls.

The three biggest savings from those five steps, drawn out.

Schedule

Two things happen at once

Site framing waits for a floor to stand on. We build from approved drawings while the structure is still going up, so the walls are on a truck the day the deck opens.

Sequence drawn for illustration — durations change with the job, the overlap does not.

DECK READYFRAMED ON SITEOne thing after anotherStructureLayoutCut & frame on the deckSheathePREFABTwo things at onceStructureDrawingsBuilt in our shopSetHanded back to the scheduleSTARTTIME
ON THE DECKOverhead, off a lift, in the weather.IN OUR SHOPWaist-high, against a stop, under a roof.

Labor & safety

The hours come down off the lift

Measuring, cutting and screwing move to a jigged table. What is left on site is setting.

STOPASSEMBLY TABLED1 = D2D1D216" o.c.

Quality

Square before it leaves the table

Framed against a stop and checked corner to corner — every member cut to the 1/16 in.

What we build

Two Assemblies.
Both Priced Online.

Configure either one online. The drawing and the price move as you type.

Pre-fabricated boxed beams

Two Studs, Two Tracks,
Priced Instantly.

Give us the stud, the track, the screw frequency and the length. We build the box, insulate it if you want, and tag it by mark.

Pricing
Live, as you type
Lengths
2 ft – 40 ft
Screws
Your spacing, counted for you
Insulation
Mineral wool or fiberglass

Prefabricated wall panels

Simple Panels Quote Online.
Complex Panels, Fast.

Straight rectangular panels price themselves. Openings, rake tops, curves, rated or load-bearing panels go to our shop with your requirements and come back quoted.

Simple panels
Priced online, instantly
Complex panels
Quoted by our shop, fast
Stud spacing
12 · 16 · 19.2 · 24 in.
Sheathing
Priced in, if you want it

Try It on One Wall.
Price It Now.

Two minutes in the configurator gets you a drawing and a number to hold against your own framing estimate.