A Whole Job, Room by Room
Calculator.

Estimate a small job room by room: drywall sheets, joint compound, tape, screws, metal studs, track and ceiling tile for every room and for the whole job. Add the answer to a material list with the other calculators, then price the list in your order.

calculators
8
rules you can change
23
material list
1
  1. 1 · EnterThe sizes off the plans

  2. 2 · SeeThe count, and how it was worked out

  3. 3 · AddEach answer to one material list

  4. 4 · SendThe list to your order or a submittal

A Whole Job, Room by Room

A row for each room in. Board, finishing, framing and ceiling for the whole job out.

Meant for a small job or a quick check. Each room counts the board on its own side of its walls, so list the corridor as a room to pick up its side. Studs are counted at the tallest room's height.

You need about

56sheets, 4′ × 12′

2,422 SF of board · 202 studs · 1,304 SF of acoustical ceiling

  • Drywall stud, 3-5/8" 25 ga EQ, 10′

    148 at 16″ o.c. + 44 for openings, corners and ends, 5% waste

    202pcs707 lb

  • Track, 3-5/8" 25 ga EQ, 10′

    405 LF: floor and head, 30 LF over and under openings, 5% waste

    43pcs142 lb

  • Framing screws, 7/16″ pan head

    4 at each stud, 8 more at each opening

    856screws

  • Type X Drywall, 4′ × 12′

    2,422 SF of board, 10% waste, 48 SF a sheet

    56sheets5,914 lb

  • Paper joint tape, 500′ roll

    896 LF at 0.37 LF per SF of board

    2rolls

  • All-purpose joint compound, 3.5 gal box

    Tape and bed coat, 1 box per 850 SF

    3boxes150 lb

  • Lightweight topping compound, 3.5 gal box

    Two finish coats for Level 4, 1 box per 700 SF for two coats

    4boxes128 lb

  • Drywall screws, 1-1/4″ fine thread

    1.13 per SF on framing 16″ o.c., about 10 lb

    The catalog does not list how many are in a box. 5,000 assumed for 1-1/4″.

    2,725screws9 lb

  • Ceiling panels, 2′ × 2′

    1,304 SF with 10% waste. Pick a panel to see cartons.

    359panels

  • 15/16″ main runner, 12′

    Mains 4′ apart, running the length of each room

    27pcs

  • 15/16″ cross tee, 4′

    Between the mains, 2′ apart

    174pcs

  • 15/16″ cross tee, 2′

    Splits each 2′ × 4′ opening for a 2′ × 2′ panel

    188pcs

  • Wall angle, 12′

    Around the walls of each room

    23pcs

  • Hanger wire, 12 ga

    One every 4′ along each main. Seismic bracing and fixtures need more.

    The catalog does not list how many wires are in a bundle. 100 assumed.

    68wires

The rooms

RoomLengthWidthHeightDoorsWindowsCeilingShared wallsSheets
29
12
9
7

Board by room

  • Open office1,238 SF
  • Conference519 SF
  • Office 1360 SF
  • Restroom305 SF
The rules this uses — change them to yours
%
%
%
SF
SF
ea

These start at the figures our own takeoffs use. Your changes are kept in this browser and used by every calculator.

Estimates, worked from the sizes you enter and the rules shown under each calculator. Check them against the drawings before you order. Rated and structural walls are built to the tested assembly and the engineer's design, not to a rule of thumb.

Reference

The FiguresBehind the Answers.

A count is a size multiplied by a rule. These are the rules and the weights the calculators start from. The weights are the manufacturers' published figures for what we sell.

Studs in 100 ft of wall

Length over spacing, plus one. No openings or corners.

  • 12″ on centre101 studs
  • 16″ on centre76 studs
  • 24″ on centre51 studs

Weight of a 3-5/8″ stud

Pounds per foot, by gauge. ClarkDietrich ProSTUD.

  • 25 ga EQ · 15 mil0.3 lb/ft
  • 20 ga EQ · 18 mil0.4 lb/ft
  • 20 ga DW · 30 mil0.7 lb/ft
  • 20 ga · 33 mil0.8 lb/ft

Weight of a 4 × 12 sheet

Pounds, by board. CertainTeed published weights.

  • Type X Drywall105.6 lb
  • 1/4" Regular Drywall54.2 lb
  • 3/8" Regular Drywall60 lb
  • Easi-Lite® Lightweight Drywall62.4 lb
  • 1/2" M2Tech® Drywall76.8 lb
  • 5/8" M2Tech® Drywall105.6 lb
  • 1/2" GlasRoc® Interior Drywall86.4 lb
  • 5/8" GlasRoc® Interior Drywall115.2 lb
MaterialThe rule we start fromFor 1,000 SF of board
Joint tape0.37 LF for each SF of board370 LF, one 500′ roll
All-purpose compound, taping coat1 box (3.5 gal) covers 850 SF1.2 boxes
Topping compound, two finish coats1 box (3.5 gal) covers 700 SF1.4 boxes
Drywall screws, framing 24″ o.c.0.75 for each SF750 screws, about 2.5 lb
Drywall screws, framing 16″ o.c.1.13 for each SF1125 screws, about 3.8 lb
Level 5 primer-surfacer1 gallon covers 110 SF10 gallons
Board waste10%23 sheets of 4 × 12

After the count

Three Things to DoWith a Material List.

Price it in your order

The list opens matched to our catalog with the sizes you chose. Change a quantity or a brand, then request a quote or place the order.

Back to the list

Build the submittal

The same products go to the submittal builder, which binds each manufacturer's data sheet into one PDF with your part numbers marked.

Open the submittal builder

Have the plans taken off

For a full set of drawings, upload the bid documents. We measure every wall and ceiling and send back the takeoff, an Excel bid sheet and a quote.

See the AI takeoff service

Questions

How theCounts Are Made.

The rules behind each calculator, in a sentence or two.

How many metal studs do I need for a wall?

Divide the wall length in inches by the stud spacing and add one. A 48 ft wall at 16 inches on centre is 37 studs. Then add two for each door or window, two for each corner and one for each free end, and about 5% for waste. The metal studs calculator does this and adds the track.

How many sheets of drywall do I need?

Multiply the wall length by the height, and by two if both sides get board. Take out about 21 square feet for a door and 15 for a window, add 10% for waste, and divide by the area of one sheet: 32 square feet for a 4 × 8, 48 for a 4 × 12.

How much joint compound and tape does drywall take?

For a Level 4 finish we figure one 3.5 gallon box of all-purpose compound for every 850 square feet of board for the taping coat, one box of topping compound for every 700 square feet for the two finish coats, and 370 feet of tape for every 1,000 square feet. You can change each figure to your own.

How do I figure a suspended ceiling grid?

Main runners run the length of the room, 4 ft apart. Four-foot cross tees go between them every 2 ft. A 2 × 2 ceiling adds a 2 ft cross tee in each opening. Wall angle goes around the room, and a hanger wire carries each main every 4 ft. Enter the room size and the ceiling calculator counts each part.

Where do the waste factors and coverage figures come from?

They are the figures we use for our own takeoffs: 10% waste on board, 5% on framing and insulation, 10% on ceilings and trim. Each calculator shows the rules it used under its result, and every one of them can be changed. Your changes are kept in your browser.

Can I order what the calculator gives me?

Yes. Add each answer to the material list, then press Price it in your order. The list opens matched to our catalog with the sizes you chose. Items with a list price are priced straight away and the rest go to our desk for a number. Nothing is ordered until you check out.

Are these numbers good enough to bid from?

They are estimates from simple rules, good for a small job, a change order or a check on somebody else's count. For a bid on a full set of plans, use the AI takeoff service: it measures every wall and ceiling on the drawings.

Do the calculators work for rated or structural walls?

They count material. They do not design a wall. A fire-rated or sound-rated wall is built to its tested assembly, and a structural or exterior wall to the engineer's design, so take the stud size, gauge and spacing from those and use the calculator for the quantities.